超低温フリーザー電源および電子制御機器システムの説明
Ultra-low temperature freezer needs to be tested after a long time of use. What should be paid attention to when the power supply and electronic control instrument system are inspected?
Check the ultra-low temperature freezer power supply and the electronic control instrument system. Before starting the power, check whether the power distribution capacity matches the unit power, and whether the selected cable diameter can withstand the host operating current. Check whether the electrical system is consistent with the unit. The unit is electrically: three-phase five-wire system (three phase lines, one neutral line, one ground line, 380V ± 10%). Check if the power supply line of the compressor is connected tightly. If it is loose, retighten it. The torque at the compressor wiring is 500kg/cm. Due to factors such as long-distance transportation and lifting, the screws may be loose. Failure to do so may result in damage to electrical components (such as air switches, AC contactors, etc.) and compressors in the main control cabinet.
Use a multimeter to carefully check all the electrical circuits of the ultra-low temperature freezer, check that the wiring is properly installed in place; use megaohm measurement to make sure there is no short circuit in the case; check that the ground wire is properly installed in place, and the insulation resistance to ground is greater than 2MΩ; check if the power cable is suitable. Capacity requirements. Check if the disconnect switch is installed on the power supply line of the supply unit. All the wiring of the main circuit in the control cabinet and the external wiring of the control circuit can be energized after comprehensive inspection (such as crankcase oil heater, compressor electronic protector, circulating water temperature sensor, target flow switch wiring, pump connection) Control, etc.); Check if the terminal bolts are tightened and there is no looseness.
The performance of the power supply and the electronic control instrument are more important in the operation of the ultra-low temperature cold box, so regular inspection is recommended.
関連推奨品
-
半導体恒温装置の価格をどう選ぶか?
2125現在、ほとんどの工業生産は、専門的な冷凍を提供する半導体恒温システムを必要としていると言える。効率的な半導体恒温システムは、さまざまな産業で大きな助けとなる。
詳細を見る -
統合制御システム高温・低温サイクル装置 ZLFシリーズ使用項目
2048社会の発展に伴い、化学工業はさらに発展し、原子炉の温度システム制御が強化され、監視環境を良好な状態に保ち、温度...
詳細を見る -
脱炭酸反応条件とプロセス温度制御は?
2219芳香族酸の脱炭酸は脂肪酸のそれよりも簡単である。例えば安息香酸は、キノリン溶液に触媒として銅粉を少量加え、加熱することで脱炭酸できる。強い電子求引性基を持つ場合、芳香族酸の脱炭酸は容易である。
詳細を見る -
低温での材料老化試験装置の冷凍システム故障のトラブルシューティング
2202低温・高温エージングテストシステムの定期的なメンテナンス作業や、冷凍システムのトラブルシューティングも非常に重要である。以下はそのヒントである。1.2倍の高圧で排気し、放熱マ...
詳細を見る