新エネルギー車パワーバッテリー検出システム真空の説明
The new energy power vehicle power battery test checks the vacuum pump switch in the closed state before operation; when the vacuum pump is placed horizontally, ensure that the lubricating oil and the oil level line are kept horizontal; whether the sealing rubber pad is damaged; whether the pressure gauge needle is returned to zero. Place the vacuum pump on the indoor floor (safe, stable, and easy to operate). It is forbidden to be placed outdoors, and it is not allowed to be placed on the power battery test of new energy power vehicles. Combine the fluoridation tube, pressure gauge and vacuum pump, unscrew the nut at the fluorination port from the large valve, screw the fluorotube onto the fluoride port, and confirm whether the thimble is in the top position. (It is forbidden to tighten the joint with tools such as pliers). First open the pressure gauge valve, then open the vacuum pump power switch and start vacuuming.
Observe the pressure gauge (low pressure) when vacuuming. Stop the vacuum after the pressure reaches -0.1 MPa (negative pressure). The vacuuming time should be determined according to the size of the model and the vacuum pump. The reference time is 10 to 30 minutes, not less than 5 minutes. And should be based on the pressure value displayed on the pressure gauge. First close the pressure gauge valve and then turn off the vacuum pump power switch. Remove the fluorinated tube from the vacuum pump and tighten the air pump nozzle cap to prevent dust from entering. After vacuuming, the pressure must be checked after the pressure is maintained. The pressure is not more than -0.08MPa. If the pressure is greater than -0.08 MPa, the cause of the leak should be found. The pressure is not more than -0.08 MPa (a small amount of rebound with a pressure of 0.02 MPa is allowed). If the pressure is greater than -0.08 MPa, indicating that there is a leak, find the cause of the leak and repeat the above procedure after solving it.
The new energy power vehicle power battery test confirms that there is no leak point and then opens the small valve spool. When the pressure (low pressure) reaches 0.1 MPa-0.5 MPa, the small valve is closed. When the pressure gauge pointer does not move, the pressure gauge valve should be opened a little to see if there is gas discharge. If there is no gas discharge, the fluorine tube is not connected with the valve. The thimble of the fluorine tube does not open the top core of the valve. . At this point, the vacuuming operation should be repeated (starting from the fourth step). After confirming the end of the pumping operation, quickly remove the fluoridation tube and pressure gauge, and then re-open the small valve and turn it back half a turn. After fully opening the large valve and turning a half turn, immediately tighten the valve back cover nut to prevent the valve core rubber seal from leaking and tighten the nut.
The vacuum state of the new energy power vehicle power battery test has a certain impact on its operation, so we need to avoid these external factors that affect the new energy power car power battery detection system.
関連推奨品
-
Rapid temperature change test chamber temperature control instructions
2150The selection of the humidity range of the rapid temperature change test chamber should be noted that the corresponding temperature range should be indicated after the humidity index or the dew point temperature should be given. Because relative h...
詳細を見る -
グリコール・チラー・システムの冷凍原理とは?
2415Glycol Chiller System , as we can tell from its name, it is to use Glycol as the refrigeration agent for the chiller. In the all air environment, because of the low temperature in the outdoors, it is impossible to use a cooling tower to supply...
詳細を見る -
高温・低温環境チャンバーの使用詳細
2073企業ユーザーは、高温・低温環境チャンバーを長く使っているうちに、その機能をある程度理解しているはずだが、高温・低温環境チャンバーの細部については、まだ理解できていないかもしれない。
詳細を見る -
Effect of cooling and heating temperature cycle during emulsification
2965Emulsification is the effect of a liquid in which even tiny droplets are evenly dispersed in another liquid that is incompatible with each other. Emulsification is a liquid-liquid interface phenomenon. Two immiscible liquids, such as oil and water...
詳細を見る