高温シリコーン油の冷却と加熱サイクル機械のメンテナンス手順
The mechanical wear of the high temperature silicone oil cooling and heating cycle machine is an important factor that directly affects the refrigeration capacity. It is necessary to record the operating parameters during use, often listen to the sound during the operation, and check the refrigerant and refrigerating oil. Troubleshoot based on this, regular maintenance and maintenance, so that when the high-temperature silicone oil cooling and heating cycle machine fails, the maintenance personnel can quickly find the problem and eliminate the fault by referring to the recorded parameters.
Maintenance steps:
1. Discharge the refrigerant in the industrial chilled system: the needle valve is kept on the suction side of the industrial explosion-proof low-temperature refrigerator, the three-way valve is connected to the needle valve, the operating valve is opened, and the inside of the refrigerator is cooled. All reagents in the industrial refrigerator system have been discharged;
2. Replace the faulty parts of the high-temperature silicone oil cooling and heating cycle machine: If you know which parts are faulty, please directly replace the faulty parts;
3. Nitrogen flushing and pressure test: Nitrogen is still injected through the needle valve on the suction side of the industrial high-temperature silicon oil cooling and heating cycle machine;
4. Vacuum: After the pressure test, the industrial refrigerator needs to be vacuum cleaned to ensure that there is no problem;
5. Refrigerant filling: There are two filling methods for the refrigerant in the high-temperature cooling and heating cycle machine, namely the low-pressure side filling method and the high-pressure side filling method;
6. Test run: After completing the above steps, please test run the high-temperature silicone oil cooling and heating cycle machine to ensure that there is no problem;
After completing the maintenance of the high-temperature silicone oil cooling and heating cycle machine and troubleshooting, the performance of the corresponding parts will be tested to ensure the reliable and stable operation of the equipment.
関連推奨品
-
リニア急速温度変化テスターの空充填手順
2128リニア急速温度変化テスターを始動する前に、防火、保護、漏れ防止、その他のツールなど、関連する保護措置が整っているかどうかを確認します。電源が適切かどうかを確認する。
詳細を見る -
How to reduce the condensing pressure of the heating circulator unit?
2194During the operation of the heating circulator unit, the temperature change inside the equipment will cause the condensing pressure to change. Especially in summer when the condensing pressure is too high, the power consumption of the compressor w...
詳細を見る -
グリコール・チラーの原理分析
2000Glycol chiller is an industrial chiller with glycol as refrigerant. The structure of glycol chiller is roughly the same as that of ordinary industrial chiller, which is composed of compressor, evaporator, condenser and electric control system....
詳細を見る -
LED LCD display thermal test system operation process
1884The integrated semiconductor industry has developed rapidly in the past two years, which has driven other industries around it. The chip thermal test system is one of the products. In order to avoid machine failures in the LED liquid crystal displ...
詳細を見る
工業冷水機製造商 LNEYA Taiwan