Maintenance knowledge of 12HP (8.9kW) low temperature chiller
The user can arrange the operator to learn about the daily maintenance knowledge of the 12HP (8.9kW) low temperature chiller after purchase. It can not only improve the company’s product quality, improve production efficiency, but also extend the service life of the 12HP (8.9kW) low-temperature chiller by using the knowledge learned.
1. In the initial operation of the 12HP (8.9kW) low-temperature chiller, the oil level, oil return and oil cleanliness of the compressor should be observed frequently. If the oil is dirty or the oil level drops, it should be replaced or added in time to avoid poor lubrication and affect refrigeration. machine is running.
2. For air-cooled: the air-cooler should be cleaned frequently to maintain a good heat exchange state, and the condenser should be checked frequently for scaling problems, and the scale should be removed in time.
3. For water-cooled: Always check the turbidity of the cooling water, if the cooling water is too dirty, it needs to be replaced, whether the water pump is working normally, whether the valve switch is effective, whether the cooling water tower and the fan are normal.
4. For the air-cooled evaporator: it is necessary to check the defrosting situation frequently. Whether the defrosting is timely and effective will affect the cooling effect and cause the refrigeration system to return to liquid.
5. Always observe the compressor running status of the 12HP (8.9kW) low-temperature chiller, check its exhaust temperature, and pay special attention to the running status of the system when operating in a seasonal change, and adjust the liquid supply and condensing temperature of the system in time.
6. Carefully listen to the running sound of the compressor, cooling tower, water pump or condenser fan, find out and deal with it in time, and check the vibration of the compressor, exhaust pipe and water pump at the same time.
7. After 30 days of operation, the refrigerating oil and drying filter should be replaced once, and after half a year of operation (depending on the actual situation). For systems with higher cleanliness, the refrigeration oil and filter drier should be replaced after six months of operation.
Our LNEYA is a professional chiller manufacturer, our customers are located in Europe, America and Southeast Asia. For the 12HP (8.9kW) low temperature chiller, you can contact us if you have any questions.
Recommandations connexes
-
Multi-stage refrigeration system centrifugal compressor repair instructions
2548After the centrifugal compressor of the cascade refrigeration system is disassembled, the dimensions of each journal (cooperating with the impeller, bearing, coupling, etc.) are measured with an outer diameter micrometer to calculate the roundness...
Voir les détails -
Description du système de contrôle dynamique de la température LNEYA
2530The long-term research of LNEYA state temperature control system has been extended to the pharmaceutical chemical industry for a long time. The dynamic temperature control system is safe after-sales service, and it is strictly tested before leavin...
Voir les détails -
Quels sont les facteurs liés à la sélection des circulateurs de chauffage et de réfrigération ?
1989Les circulateurs de chauffage et de réfrigération sont utilisés dans de nombreux projets de laboratoire. Ils sont généralement équipés de réacteurs et de réacteurs de refroidissement, de chauffage et de contrôle de la température. Alors, quels sont les facteurs liés à la sélection des circulateurs de chauffage et de réfrigération i...
Voir les détails -
Benefits of Winterizing and Degassing Prior to Distillation
1862Prior to distilling oil, you should follow a winterization and degassing procedure. The winterization will remove fats, waxes, and other inactive and unwanted compounds. Degassing will remove any solvents and other inactives with low boiling point...
Voir les détails
工業冷水機製造商 LNEYA Taiwan











