Installation points of cryopumps in cryogenic refrigerators
In the construction of the cryogenic refrigerator, the cryopump is a must. The low temperature freezer manufacturer LNEYA tells everyone that the cryopump should be operated according to the requirements when it is installed.
Installation facilities and requirements:
The foreline pump—the cryopump requires a pre-stage pump pre-vacuum chamber to draw the start-up pressure of the cryopump and to remove the gas generated during regeneration when the cryopump is regenerated.
Adsorption well—Install the water-cooled baffle. If the oil vapor returns to the cryopump, the low-temperature freezer tells you that if its adsorption array is contaminated, the adsorption array must be replaced.
High vacuum valve—installed between the cryopump and the vacuum chamber, which can shorten the start-up time, regenerate the cryopump without deflation in the vacuum chamber, and leak the vacuum chamber at any time.
Pre-pumping valve—At the pre-pumping port of the cryopump, a valve must be installed. The valve is open during pre-extraction and regeneration, and is closed during operation of the cryopump. Another one is used for The same mechanical pump pre-extracts the vacuum chamber.
Installation of compressor:
Make sure the compressor is placed on a stable level.
Static pressure – turn off the compressor and let it be at room temperature. The pressure should be between 1.4-1.5 Mpa. If the pressure indication is low, you need to add some He gas (99.999% purity).
The cooling water pipe connected to the compressor is connected to the water-cooled compressor.
Install the cryopump:
High vacuum flange connection
The cryostat Xiaobian tells you that the cryopump can be fixed in any place required by the vacuum chamber by means of its high vacuum flange. Please check whether the “O” ring is intact before installation, and the surface is free of indentation and debris. .
Connection of the suction port and the safety valve
The cryopump cannot be vented during operation, so it is necessary to pre-pump the cryopump through the suction port by using a rough pump such as a mechanical pump before starting, and it can be used as an outlet for the gas released during regeneration. Be sure to connect the pumping port of the cryopump to the pre-stage pump of the corresponding size.
Connect the cryopump and compressor
Remove the cryopump and compressor, as well as the protective caps on all self-sealing joints on the metal hose.
Note: Never use a cleaner to wipe the self-sealing joint in the following steps.
Before connecting, you must ensure that there are no dust, oil, particles, etc. on the joint. If necessary, use a brush to clean the thread. Use a soft cloth without cotton to wipe any dirt on the sealing surface.
Connect the metal hose, connect the hose according to the direction of the airflow, start from the compressor to the cryopump, then from the cryopump to the compressor, use two wrenches to tighten each self-sealing joint to protect the hose from twisting and leaking. , moderately tighten each joint. The low-temperature freezer, which is good, tells everyone that after the connection is completed, the indication of the pressure gauge of the compressor is checked. If it is 1.3 to 1.5 MPa, it is normal. If it is lower than this value, the purity is greater than 99.999% as described above. Add some more to your suffocation.
Special Note: The metal hose maintains a high pressure of 1.4-1.5 MPa, so it should be used with great care to prevent damage or reverse.
Recommandations connexes
-
Meet on December 16-18 [CPHI] Shanghai New International Expo Center
1729Exhibition name: The 15th World Pharmaceutical Machinery Packaging Equipment and Materials China Exhibition Exhibition time: December 16-18, 2020 Booth number: W5P08 Exhibition address: Shanghai New International Expo Center (Pudong)
Voir les détails -
La raison d'être du réfrigérateur cryogénique dans l'industrie de fabrication de pièces d'outillage
1685Cryogenic treatment is applied to worn tools, die cutter materials, and later extended to alloy steel, cemented carbide, etc., this method can change the internal structure of metal materials, thereby improving the mechanical and processing proper...
Voir les détails -
How to clean the battery cooling system of new energy vehicles?
1715The battery cooling system of the new energy model first unscrews the three screws on the upper part of the wet curtain, holds the louvers on the upper part of the wet curtain, gently pulls the wet curtain outward and then lifts it up slightly to ...
Voir les détails -
Le rôle de l'unité de contrôle de la température de la réfrigération chimique
1988Dans les usines pharmaceutiques et chimiques, les matières premières contenues dans les réacteurs impliqués dans la production industrielle nécessitent un refroidissement et une réfrigération rapides. Pour atteindre cet objectif, le réacteur subit une réfrigération et un refroidissement directs, ce qui indique...
Voir les détails
工業冷水機製造商 LNEYA Taiwan











