Ultra-low temperature freezer power supply and electronic control instrument system description
Ultra-low temperature freezer needs to be tested after a long time of use. What should be paid attention to when the power supply and electronic control instrument system are inspected?
Check the ultra-low temperature freezer power supply and the electronic control instrument system. Before starting the power, check whether the power distribution capacity matches the unit power, and whether the selected cable diameter can withstand the host operating current. Check whether the electrical system is consistent with the unit. The unit is electrically: three-phase five-wire system (three phase lines, one neutral line, one ground line, 380V ± 10%). Check if the power supply line of the compressor is connected tightly. If it is loose, retighten it. The torque at the compressor wiring is 500kg/cm. Due to factors such as long-distance transportation and lifting, the screws may be loose. Failure to do so may result in damage to electrical components (such as air switches, AC contactors, etc.) and compressors in the main control cabinet.
Use a multimeter to carefully check all the electrical circuits of the ultra-low temperature freezer, check that the wiring is properly installed in place; use megaohm measurement to make sure there is no short circuit in the case; check that the ground wire is properly installed in place, and the insulation resistance to ground is greater than 2MΩ; check if the power cable is suitable. Capacity requirements. Check if the disconnect switch is installed on the power supply line of the supply unit. All the wiring of the main circuit in the control cabinet and the external wiring of the control circuit can be energized after comprehensive inspection (such as crankcase oil heater, compressor electronic protector, circulating water temperature sensor, target flow switch wiring, pump connection) Control, etc.); Check if the terminal bolts are tightened and there is no looseness.
The performance of the power supply and the electronic control instrument are more important in the operation of the ultra-low temperature cold box, so regular inspection is recommended.
Verwandte Empfehlungen
-
Wie lässt sich das Problem des Ausfalls der Umwälzpumpe der Kühlanlage lösen?
2081Kühlung Heizgeräte sind in vielen chemischen, pharmazeutischen und Laboranwendungen erforderlich. Dann, wie das Scheitern der Kühlung Heizung Gerät zu lösen ist auch besorgt über, wie es zu lösen? 1. Ausfall der Umwälzpumpe Die Umwälzpumpe...
Details anzeigen -
Vacuum coating high and low temperature circulation system operation method
2516In many current chemical experiments, the vacuum coating high and low temperature circulation system can be used, making the high and low temperature refrigeration heating system supporting the vacuum coating system, and the operation is more effi...
Details anzeigen -
Comparison of Three Test Methods for Low Temperature Chamber
22642. Non-heat dissipation test samples and heat dissipation test samples When the temperature of the test sample is stable during the conditional test period, the hottest spot temperature on the surface of the test sample is higher than the ambient...
Details anzeigen -
Semiconductor refrigeration temperature control system accessories
2124In the evaporator, since the liquid evaporates in the evaporator of the semiconductor refrigeration temperature control system, the process from liquid to gas, due to the change of the load, some of the refrigerant may not be completely evaporated...
Details anzeigen