새로운 에너지 테스트를 위한 특수 냉각기 설치 시 주의사항
The installation of the special chiller for new energy testing is an important link before operation. The quality of the installation is directly related to the operation and operation status of the special chiller for new energy testing. So, what should be paid attention to in the installation of the special chiller for new energy testing?
If the special chiller for new energy test adopts semi-hermetic or fully-hermetic compressor, an oil separator should be installed, and an appropriate amount of oil should be added to the installed oil separator. When the evaporation temperature is lower than -15 degrees, a gas-liquid should be installed. Separator and add appropriate amount of refrigeration oil. Secondly, the compressor base should be installed with a shock-absorbing rubber seat, and the installation of the special chiller for new energy testing should leave a maintenance space to facilitate the observation of the adjustment of instruments and valves.
The high pressure gauge of the special chiller for new energy testing should be installed at the tee of the liquid storage and filling valve. The overall layout of the special chiller for new energy testing is reasonable and the color is the same. The installation structure of each type of unit should be consistent.
When debugging the special chiller for new energy test, it is necessary to pay attention to measuring the power supply voltage, measuring the resistance value of the three windings of the compressor and the insulation of the motor, checking the opening and closing of each valve of the refrigeration system, and pouring the refrigerant into the storage liquid to the standard charge after evacuation. 70%-80% of the filling volume, and then run the compressor, add air from low pressure to enough volume.
After the special chiller for new energy test is turned on, first listen to whether the sound of the compressor is normal, check whether the condenser and air cooler are running normally, and whether the three-phase current of the compressor is stable. After the special chiller for new energy test cools down smoothly, check the exhaust pressure, suction pressure, exhaust temperature, suction temperature, motor temperature, crankcase temperature, and expansion valve temperature in the refrigeration system, and observe the frosting of the evaporator and expansion valve. , observe the oil level and color change of the oil glass. Check whether the sound of the special chiller for new energy testing is abnormal.
Another point is that the special chiller for new energy testing needs to pay more attention to its maintenance knowledge and carry out a lot of related maintenance work.
관련 추천
-
항온 순환 장치는 칩이 신뢰성 테스트를 완료하는 데 도움이 될 수 있습니다.
1935국내 칩 개발이 활발해지면서 칩 제조는 빠른 속도로 발전하고 있습니다. 칩이 제조 된 후 신뢰성 테스트 인 매우 중요한 링크가 있으며 항온 순환 장치는 빠르게 ...
세부 정보 보기 -
LNEYA 열전달 오일 히터의 장점
1917열전달 오일 전기 히터는 전기를 에너지원으로, 열전달 오일을 열전달 매체로 사용하는 새로운 유형의 열 에너지 변환 장치입니다. 그것은 순환 펌프의 순환 열전달 오일을 제공 할 수 있습니다 ...
세부 정보 보기 -
Model and size selection of cooling and heating circulator (pilot plant temperature control system)
2046The cooling and heating circulator adopts mechanical refrigeration, the low-temperature heating tube heats the high temperature, and the canned pump is used as the circulating pump. The liquid circulation of the whole system is closed and consists...
세부 정보 보기 -
LNEYA: 모든 디테일을 디자인하는 데 집중하여 멋진 작품을 만들 수 있습니다.
2155LNEYA는 냉장 및 난방 온도 제어 분야의 뛰어난 인재를 활용하고 있으며 강력한 기술 배경을 보유하고 있습니다. 업계에서 잘 알려진 하이엔드 R&D 팀을 보유하고 있습니다. 그것은 하이 엔드 R & D 및 응용 프로그램 팀입니다 ...
세부 정보 보기
工業冷水機製造商 LNEYA Taiwan











