Four Key Points of Water Cooled Chiller Installation
The installation of water-cooled chiller can be carried out from four aspects: first, the installation of chiller, then the installation of water pipe, water pipe cleaning and equipment insulation. Do not underestimate the installation of this part, which will directly affect the safe and stable operation of the water-cooled chiller. Here are four key installation points.
1. Installation of water-cooled chiller (mainly foundation anti vibration device)
We all know that a flat and spacious place must be selected for equipment installation, and the chiller is no exception. Many users will do a good job of foundation pouring and embed four horizontal sizing blocks before installing the chiller. Generally, the water chiller has four anchors. An adjusting base plate with two adjusting screw holes can be prepared for the anchors to adjust the levelness of the whole water chiller, and the extra gap after adjustment can be filled with concrete mortar. After the mortar is dry, the adjusting bolt can be removed, the positioning bolt can be left, and the fixing measures shall be taken for the chiller.
2. Installation of water pipe of water-cooled chiller
It is mainly the external water pipes of the evaporator and condenser. If it is a double return water pipe, it is arranged on the same side. If it is a single return or three return waterway, it is arranged on both sides. The inlet and outlet of the condenser and evaporator of the water-cooled chiller are from the bottom to the top. Remarks: water will be transported from the cooling water tower to the chiller and from the chiller to the cooled equipment through the water pump, so the water pipe installation must be carried out according to the installation diagram provided by the chiller manufacturer.
3. Water pipe cleaning of water-cooled chiller
After installing the water pipe for the equipment, the leakage test shall be conducted for the whole water system. After passing the leak test, the water pipe can be cleaned. When cleaning the water pipe, first confirm whether the placement direction of the water pump is correct, and open all inlet and outlet pipeline valves. After the pipeline is fully filled with water, start the chilled water pump and cooling water pump, stop the water pump after continuous operation for two hours, drain all cold water and clean the water pump filter.
4. Thermal insulation of water-cooled chiller
When the temperature in the system is lower than the ambient temperature, there will be a loss of refrigeration capacity. In order to reduce this loss, it is recommended to wrap a layer of thermal insulation material in the low-temperature part of equipment and pipelines. After the water-cooled chiller is installed and the system pressure test is carried out, the evaporator shell or evaporator water tank, compressor inlet pipe, return pipe, etc. shall be insulated.
Related recommendations
-
How to clean the battery cooling system of new energy vehicles?
1715The battery cooling system of the new energy model first unscrews the three screws on the upper part of the wet curtain, holds the louvers on the upper part of the wet curtain, gently pulls the wet curtain outward and then lifts it up slightly to ...
View details -
How do isolated heating refrigeration circulators deal with inefficiencies?
1901Heat dissipation is a common problem that causes inefficiencies in isolated heating refrigeration circulators, and it is also a problem that can easily occur. Many isolated heating and refrigeration circulators will have similar problems, so how t...
View details -
Misunderstandings in the use of vacuum pump temperature control system
1852When using the vacuum pump temperature control system, only the correct operation method can ensure the normal and stable operation of the equipment. If there are many wrong operation behaviors, it will directly affect the normal use of the equipm...
View details -
Memory chip test equipment system program description
2186With the rapid development of the component industry, the memory chip test equipment has also made great progress. So, how much do users know about the memory chip test equipment? In order to simplify the test steps, reduce the complexity of the t...
View details
工業冷水機製造商 LNEYA Taiwan